CommissioningStrategic PlanningDelivery AccelerationOwner's RepHandover

Accelerating the delivery of critical infrastructure.

PGCIS brings experienced team members together with new tools and process to safeguard the delivery of your critical infrastructure. Our team culture and values are a critical part of how we work, learn, and grow together.

Commissioning oversight on 2,500+ MW of hyperscale across the US and EMEA · Zero safety incidents in 2+ years

90%plusWork done right the first time
70-90%Less rework
30-50%Faster final testing

Services

Five ways we work with you.

Owners come to us at different moments: before the deal, during the build, when the schedule tightens, when it is time to prove the thing works, and when operations take over. Pick your door.

Service · 01

When it has to work

Commissioning

We test and verify every critical system, from the factory through full load, electrical and mechanical, on projects from hyperscale down to a single enterprise room. Quality built in from day one.

See commissioning

Service · 02

When you are deciding

Strategic Planning & Consulting

From the first feasibility question to the day you go live: what to build, whether a deal makes sense, what's missing from the design documents, procurement timelines, contractor agreements, and much more.

See strategic planning

Service · 03

When the schedule cannot slip

Project Delivery Acceleration

Our people, process, and technology applied across your program: first-time quality that compresses final testing, with live oversight so you see quality proven while it happens.

See delivery acceleration

Service · 04

When you are building

Owner's Representation

We are your eyes on site. We hold the builder to the schedule, the budget, and the standard, coordinate the trades, and protect your interests when decisions get made.

See owner's representation

Service · 05

When operations take over

Operational Handover

Trained operators, validated procedures, and a documented baseline for every system, ready before the construction team drives away. Support through the first seasons, not just the first day.

See handover support

Our Mission

To safeguard and accelerate critical infrastructure delivery while creating impact that outlives every engagement.

The pattern

Finding issues early saves time and money.

Your building is declared ready for systems integration testing, but the issue count starts ballooning as installation quality, settings, and documentation are all frustratingly inadequate. Finger pointing begins, stress mounts, and unplanned costs rise. For many, this has become a common but unfortunate end-of-project state.

L0 · DESIGN L1 · FACTORY L2-L3 · BUILD L4 · TESTING L5 + OPERATIONS $100 $1K $10K $100K $500K-$1M

FIG. 02 · COST TO CORRECT THE SAME DEFECT, BY WHEN IT IS FOUND

What if final testing confirmed what you knew? That your first-time installation quality was excellent. That L4/L5 will proceed on schedule and catch a few tricky errors, but you won't need a team of electricians working nights and weekends to fix installation mistakes.

This shift is possible with the right mix of process, technology, and team members working together across the trades and project leaders. Solving the issues early saves significant cost, time and stress.

The method

Three layers that work as one system: people, process, technology.

01 · People

Quality in Action™

We work side by side with your builder and their crews. We set the quality bar together, rather than handing down a binder. Before any repeating work begins, we run a FOAK-Right™ workshop on the very first installation, so it sets the standard for every one that follows. And we give specific people on the crew ownership of that standard, so it holds from the inside.

Problems get caught at the source, by the people doing the work, before they ever reach testing.

02 · Process

PrecisionLoop™

Plan, brief, execute, debrief, document. A simple, repeatable rhythm borrowed from fields where getting it wrong is not an option. Every task has a clear owner, clear expectations going in, checks along the way, and lessons that make the next task better.

The payoff grows on work that repeats: campus after campus, floor after floor. The differences between crews, buildings, and sites shrink each time around.

03 · Technology

CxIntelligence™

Our field teams capture the record as they work: photos, time stamps, equipment tags, checklists, test results. Software reviews all of it and flags anything that looks like a quality, safety, or paperwork problem, while the crew is still there to fix it.

You get a living record of the building that supports more efficient installation and commissioning, not a contractually obligated stack of files dumped on you at the end.

How the method works in practice

Where we work

Critical infrastructure where downtime is not acceptable.

Data centers are the heart of our work: hyperscale, colocation, HPC and AI, edge, and enterprise. We also take on high-tech manufacturing and energy projects when the systems simply cannot fail.

Our Work

What we've delivered.

Active · Frankfurt · Paris · Phoenix · Berlin

Confidential Hyperscale Portfolio

Commissioning550 MW

Four hyperscale campuses, 550 MW in all, under our commissioning oversight from the factory through full load. About 3,000 issues caught each construction phase, at each site.

Read case

Strategic Advisory · $10B · 1.5 GW

Adani Group · Pan-India

Advisory$10B program

Strategy for a $10B data center program across India, targeting 1.5 GW in 5 to 10 markets. We ran the tender. It closed with EdgeConnex as the joint venture partner.

Read case

Completed · 2.0 MW · HPC and ML

Confidential HPC Data Center · Austin Metro

Design + CM + CxCEEDA Gold

A 2 MW facility built for high-performance and AI computing. First CEEDA Gold certification in North America. Almost no water use, in the Austin heat.

Read case

Completed · 3 MW · Schedule recovery

Confidential Spec-Build Rescue · Midwest US

RescueZero stoppages

A project a year and a half late and $30M over budget when we stepped in. We redesigned the network, replaced the builder and several subcontractors, and finished with zero work stoppages and zero safety recordables.

Read case

Active · ~260 MW · 7 buildings

Confidential Hyperscale AI Campus

CommissioningHyperscale AI

One power-module scope grew into full commissioning oversight of all seven buildings in seven weeks. Arc-flash safety holds, protective-device audits, and high-priority issues resolved roughly 4x faster.

Read case

Completed · 24 MW · Advisory and design

Confidential Greenfield Data Center

Advisory$7M+ identified

An investor-grade decision package for a renewable-powered greenfield site, feasibility through full basis of design, delivered in six weeks. More than $7M in capital savings identified.

Read case

See all work

The team

An experienced team.

Most of our people have already built and commissioned this kind of infrastructure at the largest operators in the world.

GoogleMicrosoftOracleMetaAWSCyrusOneAlignedQTSVantageYondrNTTU.S. NavyU.S. Dept. of Veterans AffairsBAE SystemsTVAAlphabet

More about us

Careers

Senior work, real autonomy, and a stake in the outcome.

We are hiring commissioning agents, construction managers, project controls leads, and quality professionals across the US and EMEA. Small team, senior operators, and profit-sharing that makes you an owner.

Get in touch

Start with a conversation, not a pitch.

Tell us what you are building, what is actually slowing you down, and what you have already tried. We will tell you what we would do, or tell you straight if we are not the right fit.